MobileTech 2019 (7.0)
Breadcrumbs

Set up work crews

  1. In Microsoft Dynamics GP, choose Microsoft Dynamics GP > Tools > Setup > TimeTrack > Work Crews. The Work Crew Setup window is displayed.

  2. Enter a work crew name and description.

  3. Mark the Enabled checkbox.

  4. Choose Save, and then continue to set up work crews as needed.