Enter and Edit Change Orders for Jobs

You can enter change orders that apply to a job and assign specific cost codes to individual change orders.

  • If you assign a cost code to a change order, you must sync with the host system and select the cost codes for the change order in MobileTech. You can add cost codes to a change order and edit the change order and cost codes for the change order until it has a Posted status.

  • Using the Server Mode requires an internet connection.


Enter a Change Order

A change order can be entered at the job level or appointment level.

  1. To enter a change order at the job level, select Jobs.

    • Device Mode: Select the job. Select More and then select the Change Order tab.

    • Server Mode: Select the job. Select Change Orders.

  2. To enter a change order at the appointment level:

    1. Select Appointments. At the top of the pane, select the Job Appointments filter. 

    2. Select a job appointment and select More to show the details of the job appointment.

    3. Select the Change Order tab.

  3. If there are any existing change orders for the job, they will be displayed in a list.

  4. Select the New icon. Job information, including the job number, change order number, status, and contract type, is displayed. The change order number is a temporary value until you sync your device with the host system.

  5. Enter a description, and then enter the amount in the Change Order Amt. field.

  6. Select the Save icon. The change order is added to the job.

Edit an Existing Change Order

  1. To enter a change order at the job level, select Jobs.

    • Device Mode: Select the job. Select More and then select the Change Order tab.

    • Server Mode: Select the job. Select Change Orders.

  2. A list of change orders is displayed. Note that if you access the change order from the Server Mode, the details are populated after you open the change order form

  3. Select the change order to update and then change the description and the change order amount, as needed. The fields you can change depend on the status of the change order. You can enter and update a change order until it has a Posted status.

  4. Select the Save icon.

Assign a Cost Code to a Change Order

  1. To enter a change order at the job level, select Jobs.

    • Device Mode: Select the job. Select More and then select the Change Order tab.

    • Server Mode: Select the job. Select Change Orders.

  2. A list of change orders is displayed. Note that if you access the change order from the Server Mode, the details are populated after you select the change order.

  3. Select the change order.

  4. Select the Cost Codes tab to view and change cost code information for each change order. 

  5. To add a new Cost Code, select the New icon.

  6. Select a cost code. Cost element and cost code information is displayed.

  7. Enter information in these fields, as needed. The information displayed depends on whether you're creating or viewing an existing cost code record. The fields you can change depend on the status of the change order. You can enter and update a change order until it has a Posted status. (* Required field)

    • Job Number: The default job number.

    • Change Order #: The default change order number for the job.

    • Cost Element: Cost elements, which are associated with cost codes, can't be changed.
      When you create a cost code record for a change order, this field isn't available. However, when you select a cost code, the cost element that is associated with the cost code is displayed. For an existing change order, the cost element for the cost code is displayed. The cost element changes when you change the cost code.

    • *Cost Code: For a new cost code record for a change order, enter a cost code. For an existing cost code, the default cost code and cost element for the change order are displayed, but you can select a different cost code if the change order isn't posted.

    • Est. Units: For a new cost code record for a change order, enter the number of estimated units that are required for the change order. The type of units is based on the method of measuring units that you select in the Estimate Measure field.

    • Est. Amt. Per Unit: Enter the estimated amount per unit of the cost code for the change order. The type of units is based on the method of measuring units that you select in the Estimate Measure field.

    • Est. Amount: The total estimated amount of the cost code for the change order. The calculated amount is based on the total estimated units and the estimated amount per unit.

    • Estimate Measure: The default method of measuring the units that the change order is based on for the job is displayed, such as hours (HR) or items (EA), but you can select a different measure. The values that are available for this field are set up in Job Cost.

  8. Select the Save icon.

Adding a Note to a Change Order

After the change order is synced, you can select the Notes tab to view or enter information about each change order, as needed. On the Notes tab, select the New icon to create a note. The job number and change order number are displayed. Enter a subject and description, and select Yes in the Internal Note field if the note should be internal only.